It seems like a ton of time has passed, because we have done so much, but really, it has only been a week or so.  Wow!! 

In the last week, we finished up the laundry room.  Curtis let me do the plumbing for the washer while he worked on running new gas line for the dryer. Curtis built the arches for the doorways in the kitchen and I LOVE THEM!!! They will be so pretty when we get the sheetrock and painting all done.  I am almost done doing the insulation for Cara's room, and I have a couple more pieces to do by the back door. 

Now Curtis is working on the electrical in the living room. Every day I spend up there with him, I can't help but know how lucky I am.  We could have moved in as soon as he bought the place, and most people would have.  But Curtis isn't "most people."   It was really important to him to know that the plumbing all works right before he turns the water on, and he wanted to check out the electrical, because it was very difficult to determine what went where. 

And I am so glad. 

To date, Curtis has pulled just over a half a mile of new wire for the house and the shop.  I say it is worth it.

Sunday, January 23, 2011

The Laundry Room & Other Odds 'n Ends

No pictures this week, because, really, photos of wiring, plumbing and insulation are just boring.  But the things we have accomplished this week are really very exciting. 

After we got the backer board down in the kitchen, Curtis took a grinder to the concrete so that concrete floor would be level with the wood floor.  The tile is going to be pretty pricey, mostly because of the sheer volume.... 753 square feet!! So, we want the subfloor to be as good as possible so the tiles dont crack.  Using the grinder worked like a charm and we may even be able to get away without using the extra membrane. 

Moving on to other things, we have been working in the laundry room this week.  One of the things Curtis really didn't like was having the washer on one wall, and the dryer on a different wall. So, he fixed it.  He had to put in a rigid dryer vent, run gas lines for for the dryer, re-do the plumbing and electrical. 

It was the cutest thing tonight when the girls got home -- he sounded so proud of me when he told them all about how their mama cut the wood, ran the nailgun, pulled the wires, put in the Pex lines for the washer & dryer.... and I hung the insulation in Cara's room upstairs.   That is quite the compliment coming from Curtis -- he has really high standards when he is working and it isn't easy for other people to meet those standards. 

I had a blast working on the house this week -- finally there are things I can do so to help, which is nice because I really like spending time with Curtis.

Sunday, January 16, 2011

We have a mudroom!!!!

Just a quick post....... the mudroom/bath is framed, plumbed, wired and the backerboard is down.  I am so excited to have a place for all of the shoes/coats/backpacks to land.  That part is all ready for sheetrock, and we did some shopping today for a mirror and light fixtures. 

We also have the backerboard finished in the kitchen.  I got to spend the day with Curtis yesterday, so I was able to help him get the screws in .  Of course, if you ask him he will tell you I am not allowed to help anymore.... because I ran out of screws. 

I have picked out the tile I want..... problem is, we have a LOT of tile to put down.  For the kitchen/dining, pantry, mudroom, entry and half bath, it is 753 square feet.  Yikes..... maybe I need to shop around some more!!!
The bathroom in the living room, BEFORE

One bathroom gutted

New crawl space, plumbing and floor

Walls framed, backerboard done.  Half bath on the left. 

The mudroom. 

And we have a floor in the kitchen, almost.  OK, maybe it will be a while.

Used to be an entry door to the garage, now a wider entry to mudroom on right, & garage on left.

From the garage.... (entry, mudroom.  Kitchen is on the right)

And just for kicks..... you can see that Curtis is under close supervision!